DOKUMEN BASIC DESIGN DAN EVALUASI TEKNIS PENGADAAN CONVEYOR TERMINAL TELUK LAMONG – PELINDO III
UNDER PT PP (Persero) Tbk. – 2014
DESIGN DAN ENGINEERING UBS – IIB CONVEYOR SYSTEM PT PUPUK SRIWIDJAYA
UNDER PT ADHI KARYA (Persero) Tbk. – 2015
COAL BIN TUBAN P2KPT
PT SEMEN GRESIK TUBAN – 2012
ENGINEERING DESIGN DAN SUPPLY CONVEYOR SYSTEM PLTU TIMOR – 1 CSFPP 2X50 MW – PT PLN
UNDER PT IKPT – 2020
ENGINEERING DESIGN, PROCUREMENT, DAN CONSTRUCTION CONVEYOR SYSTEM PLTU PALU – 3 CSFPP 2X50 MW – PT PLN
UNDER PT WIJAYA KARYA – 2020
ENGINEERING DESIGN DAN SUPPLY CONVEYOR SYSTEM PLTU SULUT – 1 CSFPP 2X50 MW – PT PLN
UNDER PT IKPT – 2021
ENGINEERING | ||||||
---|---|---|---|---|---|---|
1 | Pekerjaan Engineering (Supporting for CBU Rectification Work) pada Proyek Timor-1 Coal Fired Steam Power Plant (CFSPP) 2x50 MW | PT IKPT | 2023 | |||
2 | Pekerjaan Jasa Konsultan Penyusunan Dokumen Basic Design dan Evaluasi Teknis Pengadaan Conveyor di Terminal Teluk Lamong | Pelindo III | 2018 | |||
3 | Jasa Konsultan Perancangan Ulang dan Review Design pada Pekerjaan Penambahan Peralatan Penunjang untuk Sistem Conveyor Bongkar di Terminal Teluk Lamong | Pelindo III | 2018 | |||
4 | Jasa Engineering (Additional BC01 dan TT01) Proyek Tembilahan | PT Lintang Andalan Makmur | 2016 | |||
5 | Repainitng dan Restruktur Frame dan Support Conveyor BC 01 dan BC 02 PLTU Rembang | 2015 | ||||
6 | Perencanaan dan Detail Drawing Flexibilitas Produk Raw Mill 4 ke Silo Tuban 3 | PT Semen Indonesia | 2015 | |||
7 | Perencanaan dan Design Drawing Mechanical "Silo Raw Cement 10,000 ton dan Silo Product 20,000 ton - Ciganding Plant" Dept. 3 Cement Silo dan Packing Plant | PT Semen Indonesia | 2015 | |||
8 | Perencanaan dan Design Drawing Pembangunan Storage dan Fasilitas Transport Limbah B3 | PT Semen Indonesia | 2014 | |||
9 | Pekerjaan Design dan Engineering UBS-IIB dan Conveyor System | PT Pupuk Sriwidjaja | 2014 | |||
10 | Engineering Drawing Belt Conveyor MOP Project Line 4 | PT Artawa Indonesia | 2014 | |||
11 | Engineering Drawing untuk Coal Handling System Pomalaa Plant 2 X 7 MW | PT Siko | 2014 | |||
12 | Pekerjaan Hot Splicing Conveyor untuk PLTU Maluku Utara 2 X 7 MW | PT Rekadaya Elektrika | 2014 | |||
13 | Pekerjaan Replacement Underground Hopper PLTU 1 NTT 2 X 7 MW | PT Rekayasa Industri | 2014 | |||
14 | Perencanaan dan Design Drawing Modifikasi Tangki IDO Menjadi Tandon Air Hydrant Pelsus Tuban | PT Semen Indonesia | 2014 | |||
15 | Perencanaan dan Design Drawing Feeding System Packing Plant Balikpapan | PT Semen Gresik | 2013 | |||
16 | Truck Unloading PP Balikpapan dan Transport Packer Balikpapan | PT Semen Indonesia | 2013 | |||
17 | Pekerjaan Design Drawing Modifikasi 541, 543, 545 BC5 | PT Semen Indonesia | 2013 | |||
18 | Pekerjaan dan Design Drawing Rotary Feeder Raw Mill Tuban 2 & 3, Screw Conveyor Reject dari Conditioning Tower Tuban 2 | PT Semen Indonesia | 2013 | |||
19 | Pekerjaan dan Design Drawing Flexibilitas Transport Clinker TB3 ke TB4 & Flexibilitas Trass Transport Tuban 4 ke Tuban 3 | PT Semen Indonesia | 2013 | |||
20 | Pekerjaan dan Design Drawing Dust Spray for Raw Coal | PT Semen Indonesia | 2013 | |||
21 | Pekerjaan dan Design Drawing Flexibilitas Transport Semen dari Silo Tuban 1,3,4 ke Conveyor Pelabuhan | PT Semen Indonesia | 2013 | |||
22 | Pekerjaan Engineering dan Design Drawing Flexibilitas Semen Transport dari Tuban 3 ke Tuban 4 | PT Semen Indonesia | 2013 | |||
23 | Design dan Engineering Work Redundant Coal Conveyor Pacitan | 2013 | ||||
24 | Engineering Design untuk Proyek Terminal Storage Tank Kariangu Balikpapan Kalimantan Timur | PT Mitra Abadijaya Engineering | 2013 | |||
25 | Design dan Engineering Work Redundant Coal Conveyor Tembilahan | 2013 | ||||
26 | Design Engineering Product Transparant Raw Mill dari Tuban 2 ke Tuban 1 | PT Semen Gresik Tbk. | 2013 | |||
27 | Pekerjaan Engineering Drawing Belt Conveyor, Belt Feeder, dan Shuttle Conveyor MOP Project Line 4 - Antam Project | PT Artawa Indonesia | 2013 | |||
28 | Pekerjaan Engineering Drawing untuk Coal Handling System Pomalaa Power Plant 2 X 25 MW Sumitomo Heavy Industries Project | PT Artawa Indonesia | 2013 | |||
29 | Engineering Drawing Belt Conveyor untuk Lime Calcining Plant | PT Krakatau Engineering | 2012 | |||
30 | Engineering Design Conveyor & Mechanical Line B dan C | PT Krakatau Engineering | 2012 | |||
31 | Engineering Design Conveyor & Mechanical Line A, D, dan F | PT Krakatau Engineering | 2012 | |||
32 | Detail Drawing Conveyor Lime Calicining | PT Krakatau Engineering | 2012 | |||
33 | Engineering Drawing Chute Work untuk Sinter Plant | PT Krakatau Engineering | 2012 | |||
34 | Perencanaan dan Design Drawing Trass Transport 519BC1 s/d 519BC6 Trass Storage | PT Semen Gresik Tbk. | 2012 | |||
35 | Supply Engineering & Design Drawing Pneumatic dari Jetty ke Silo & Fluidslide Transport dari Silo ke Packer Plant, Sorong | PT Semen Gresik Tbk. | 2012 | |||
36 | Perencanaan dan Design Drawing Hopper dan Tunnel Coal Yard Pabrik Semen Gresik, Tuban | PT Semen Gresik Tbk. | 2012 | |||
37 | Basic Engineering Design Feeding Bahan Baku & Produk Semen Tahun 2013 | PT Semen Gresik Tbk. | 2012 | |||
38 | Perencanaan dan Design Drawing Flexibilitas Raw Material Transport dari Tuban 4 ke Tuban 3 | 2012 | ||||
39 | Perencanaan dan Design Drawing Flexibilitas 461BC3 ke 461BC4A | PT Semen Gresik Tbk. | 2012 | |||
40 | Perencanaan dan Design Drawing Project Vertical Finish Mill A1 | PT Semen Gresik Tbk. | 2012 | |||
41 | Engineering Reserving Hopper Tower | PT Krakatau Engineering | 2012 | |||
42 | Perencanaan dan Design Drawing Upgrade Stack EP Cooler Tuban 1, 2, dan 3 | PT Semen Gresik Tbk. | 2012 | |||
43 | Drawing Plant Fasade | PT Cemara Siko | 2012 | |||
44 | Perencanaan dan Design Drawing Civil Gudang Curah | PT Aneka Jasa Ghradika | 2012 | |||
45 | Paket Sipil Coal Storage | PT Semen Gresik Tbk. | 2012 | |||
46 | Design dan Engineering Work Coal Handling Plant Tembilahan | PT DEN | 2012 | |||
47 | Proyek Lime Transport Calcining Olant KS | PT Krakatau Steel | 2012 | |||
48 | Proyek Raw Material Handling Intergrated Steel Mill JV KS Posco | PT Krakatau Engineering | 2012 | |||
49 | Project Vertical Mill Fly Ash | PT Semen Gresik Tbk. | 2012 | |||
50 | Design dan Engineering Work Redundant Coal Conveyor Proejct PLTU Pacitan, PLN Pembangkitan | PT DEN | 2012 | |||
51 | Paket Sipil New Vertical Mill | PT Semen Gresik Tbk. | 2011 | |||
52 | Pekerjaan Perencanaan dan Design Drawing Upgrade Belt Conveyor 512BC1 dan 512BC7 Tuban 2 (Proyek Dolomit Bin & Feed) | 2011 | ||||
53 | Pekerjaan Perencanaan dan Design Drawing Modifikasi Hopper Terak dan Upgrade Conveyor 523 BC Tuban 3 | 2011 | ||||
54 | Pekerjaan Perencanaan dan Deisgn Drawing Bin Dolomit Tuban 1 | 2011 | ||||
55 | Pekerjaan Perencanaan dan Design Drawing Bin Dolomit Tuban 3 | 2011 | ||||
56 | Pekerjaan Perencanaan dan Design Drawing Tubing Conveyor Pelabuhan Tuban | PT Semen Gresik Tbk. | 2011 | |||
57 | Pekerjaan Perencanaan dan Design Drawing Transport untuk Trass Storage Reclaimer | PT Semen Gresik Tbk. | 2011 | |||
58 | Pekerjaan Perencanaan dan Design Drawing Penambahan Fasilitas Transport Dolomit Tuban 2 | PT Semen Gresik Tbk. | 2011 | |||
59 | Pekerjaan Perencanaan dan Design Drawing Bucket Elevator Homogenizing Silo Tuban 1 Kapasitas 800 TPH | PT Semen Gresik Tbk. | 2011 | |||
60 | Pekerjaan Perencanaan dan Design Drawing Belt Conveyor Feeding Silo, Banyuwangi | PT Semen Gresik Tbk. | 2011 | |||
61 | Pekerjaan Perencanaan dan Design Drawing Pemasangan Bahan Bakar Alternatif Tuban 1 | 2010 | ||||
62 | Pekerjaan Perencanaan dan Design Drawing Modifikasi Hopper Terak dan Upgrade Conveyor 522 BC-6 Tuban 2 | PT Semen Gresik Tbk. | 2010 | |||
63 | Pekerjaan Perencanaan dan Design Modifikasi Transport ke HRC Tuban 2 | 2010 | ||||
64 | Pekerjaan Perencanaan dan Design Drawing Pemasangan Pulverized Coal Bin 482 B13 Tuban 2 | 2010 | ||||
65 | Pekerjaan Perencanaan dan Deisgn Drawing Fasilitas Transport Bahan Baku dan Penolong - Tuban 1 dan 2 | 2010 | ||||
66 | Engineering Mekanikal dan Elektrikal Proyek Peningkatan Kapasitas Conveyor M603 (Under PT Aneka Jasa Grhadika) | PT Petrokimia Gresik | 2010 | |||
67 | Pekerjaan Perencanaan dan Design Drawing untuk Coal Handling System Project Coal Boiler Plant IKPT | PT Siko Techno | 2010 | |||
68 | Pekerjaan Perencanaan dan Design Drawing Conveyor 241 BC-050 dan BC-500 New Coal Mill, Tuban | 2010 | ||||
69 | Pekerjaan Perencanaan dan Design Drawing Modifikasi Steel Structure Atap Klin Tuban 1 | 2010 | ||||
70 | Pekerjaan Perencanaan dan Design Drawing Pondasi Support Bin 241 BI-100 New Coal Mill, Tuban | PT Semen Gresik Tbk. | 2009 | |||
71 | Design Engineering Upgrade Foundation Dual Klin Drive Tuban 1 | PT Semen Gresik Tbk. | 2009 | |||
72 | Pekerjaan Perencanaan dan Design Drawing Modifikasi Belt Conveyor 541 BC-5 Tuban 1 | PT Semen Gresik Tbk. | 2009 | |||
73 | Design Engineering Product Transport Raw Mill dari Tuban 2 ke Tuban 1 | PT Semen Gresik Tbk. | 2009 | |||
74 | Design Engineering Flexibilitas Transport Silica Sand | PT Semen Gresik Tbk. | 2009 | |||
75 | Design Engineering Flexibilitas Transport Semen | PT Semen Gresik Tbk. | 2009 | |||
76 | Design Engineering Flexibilitas Transport Husk | PT Semen Gresik Tbk. | 2009 | |||
77 | Design Barge Loading Conveyor Kapasitas 800 TPH HBI (Under PT Dewata Teknik) | 2009 | ||||
78 | Design Engineering Conveyor System Kapasitas 75 TPH untuk Power Plant (Under PT Dewata Teknik) | 2009 | ||||
79 | Detailing Engineering Expansion Project dari Material Handling P9 / P10 Indocement Palimanan | 2009 | ||||
80 | Deisgn dan Detailing Engineering Kapasitas 2,000 TPH untuk Raw Materaial Preparation dan Port Area dari Pakar Coal Terminal Petrosea | 2009 | ||||
81 | Design Engineering untuk Upgrading Kapasitas Jetty Conveying System Indocement Tunggal Perkasa Tarjun dari 600 TPH ke 800 TPH | 2009 | ||||
82 | Design Engineering untuk Kernel Handling System Indocement Tunggal Perkasa Tarjun | 2009 | ||||
83 | Pekerjaan Perencanaan dan Design Drawing Pemasangan Bin Fly Ash Kapasitas 100 ton - 125 ton Mill #1 Tuban 1 | PT Semen Gresik Tbk. | 2009 | |||
84 | Design Engineering Storage Tank untuk Pakar Coal Terminal 2,000 TPH Petrosea | 2009 | ||||
85 | Design dan Detailing Engineering untuk 36 Man Ensuite Pilbara Australia | 2008 | ||||
86 | Design dan Engineering untuk Storage Tank Blue Sky Balongan dengan diameter 65m | 2008 | ||||
87 | Design dan Engineering Square Tank untuk Storage PDAM, Kalimantan Barat | 2008 | ||||
88 | Design dan Detailing Engineering untuk Barge Unloading dan Storage Facilities Sumalinda dengan kapasitas 250 TPH, Kalimantan | 2008 | ||||
89 | Design dan Detailing Engineering untuk Tutui Coal Terminal dengan Kapasitas 600 TPH | 2008 | ||||
90 | Engineering untuk Terminal Coal Bontang | 2008 | ||||
ENGINEERING & SUPPLY | ||||||
1 | Pembangunan IPA Kap. 285 L/Detik dan Jaringan Pipa Spam Kawasan Industri Terpadu Batang Provinsi Jawa Tengah | PT Gala Karya | 2022 | |||
2 | Drag Chain Conveyor - Timor-1 CFSPP Project | PT IKPT | 2021 | |||
3 | Design dan Supply Conveyor System untuk Sulut-1 CFSPP (2 X 5 MW) termasuk dengan peralatan terkait, seperti: Bag Filter, Weighing Scale, Dus Suppression, dsb. | PT IKPT | 2021 | |||
4 | Design dan Supply Conveyor System Timor-1 CFSPP (2 X 5 MW) termasuk dengan peralatan terkait, seperti: Bag Filter, Weighing Scale, Dust Suppresion, dsb. | PT IKPT | 2020 | |||
5 | Design dan Supply Conveyor System untuk Lombok CFSPP FTP-2 (2 X 5 MW) termasuk dengan peralatan terkait, seperti: Bag Filter, Weighing Scale, Dust Suppression, dsb. | PT Rekayasa Industri | 2019 | |||
6 | Engineering, Supply, dan Pengiriman untuk Steel Structure dan Auxilary Part dari Belt Conveyor untuk Sinter Machine Extension Project | Nippon Conveyor Co. Ltd. | 2018 | |||
ENGINEERING, PROCUREMENT, AND CONSTRUCTION | ||||||
1 | Design dan Supply Conveyor System Palu-3 CFSPP (2 X 5 MW) termasuk dengan peralatan terkait, seperti: Bag Filter, Weighing Scale, Dust Suppression, dsb. | PT Wijaya Karya | 2020 |